Reports

Home

What's New

Press Releases

Becoming Involved

Photos

Maps

Reports

Trail Interpretation



Greenway-Related Reports



HALIFAX URBAN GREENWAY FUNCTIONAL PLAN FINAL REPORT May 2019

Plan and preliminary design for southern and northern extensions




January, 2013 - ENGINEERING DESIGN FIVE ACTIVE TRANSPORTATION BRIDGES Extracts from REQUEST FOR PROPOSAL




June, 2012 - Macdonald Bridge Sidewalk Deck Panels: Active Transportation Applications Final Report




April 2012, SNC Lavalin - Options Analysis and Functional Design: Potential Links between HUGA and COLTA Trails


The following excerpts from this study of potential links between the COLTA and HUGA trails present preliminary findings only. This document will not necessarily result in the construction of any of the routes analyzed within.





Student thesis design study for Marlborough Woods to the Oaks



Why a Bridge ? : The Evolution of the Greenway Concept



Railway Cut Studies and Media Coverage

Original Halifax Urban Greenway Proposal



Council Public Hearings on Rezonings Adjacent to Railway Cut (PDF documents)

Copyright © 2013, Halifax Urban Greenway Association